Lancaster, PA
- Three story addition to an existing church
-
15,000 sq ft classroom addition
- 41,000 sq ft auditorium addition with post and beam construction
-
Renovation and upgrades to the existing church
-
New worship space with seating for 1000 people
-
Extensive sitework
-
Steel trusses fabricated
on-site
-
Erection of the trusses required two cranes, one with a 190-ton capacity
-
Each truss was transported to the jobsite via a flatbed tractor trailer.
Given its huge size and weight, only one truss could be hauled on an
individual truck
Architect: Bernardon
Haber Holloway - Kennett Square, PA
|
| |